Installation Guides

Step-by-step guides to help you install and maintain your SEAPA equipment for optimal performance.

GTX20 Basket Installation

15-20 min per basket

Complete guide to setting up GTX20 baskets on longline systems.

Key Steps:

  • Prepare longline attachment points
  • Install end caps securely
  • Attach to longline system
  • Adjust spacing for optimal tumbling
  • Test and verify secure attachment

REVO System Setup

2-3 hours initial setup

Step-by-step REVO System integration with existing infrastructure.

Key Steps:

  • Assess existing longline setup
  • Install depth control mechanism
  • Connect to float systems
  • Calibrate depth settings
  • Test surface drying cycle

Basket Maintenance

Ongoing

Regular maintenance procedures to extend equipment life.

Key Steps:

  • Clean baskets after harvest
  • Inspect end caps and clips
  • Check for damage or wear
  • Replace components as needed
  • Store properly during off-season

Seasonal Preparation

1-2 days annually

Getting your SEAPA equipment ready for the growing season.

Key Steps:

  • Inspect all equipment
  • Replace worn components
  • Clean and sanitize
  • Test all systems
  • Organize by growth stage

Video Tutorials

Visual guides for common installation and maintenance tasks.

Basket Installation
End Cap Replacement
System Maintenance